Boulder Canyon project. Main control equipment, 250-volt direct-current distribution switchboards, and 400-volt and miscellaneous alternating-current control equipment for Boulder power plant, Boulder Canyon project, Ariz.-Calif.-Nev.
Publication Title:
Boulder Canyon project. Main control equipment, 250-volt direct-current distribution switchboards, and 400-volt and miscellaneous alternating-current control equipment for Boulder power plant, Boulder Canyon project, Ariz.-Calif.-Nev.
Display Title:
Boulder Canyon project. Main control equipment, 250-volt direct-current distribution switchboards, and 400-volt and miscellaneous alternating-current control equipment for Boulder power plant, Boulder Canyon project, Ariz.-Calif.-Nev.
Corporate Agency Authors:
Reclamation Bureau and Interior Department
Sort Author:
Reclamation Bureau
Date:
May 13, 1937
Publish Date ISO Format:
1937-05-13T00:00:00Z
Publication Start:
19370513
Publication End:
19370513
Corporate/Agency Author:
Reclamation Bureau
Publication month:
8
Publication year:
1937
Publication place:
Denver
Printer:
Peerless Ptg. Co.
SuDoc number:
I 27.8:736
Description:
cover title, 77 p. 29 pl. 3 tab. 4°
Notes:
(Specifications 736.) [Consists of invitation for bids, schedules, specifications, and drawings for project, proposals to be received until June 21, 1937.]
Notes:
(Specifications 736.) [Consists of invitation for bids, schedules, specifications, and drawings for project, proposals to be received until June 21, 1937.] † Distribution Made by Issuing Office. Paper, $3.00.
Availability:
† Distribution Made by Issuing Office. Paper, $3.00.