Boulder Canyon project. Main and auxiliary control equipment, load and frequency control equipment, battery distribution switchboard, and auxiliary power control equipment for units A-6 and A-7, Boulder power plant, Boulder Canyon project, Ariz.-Calif.-Nev.
Publication Title:
Boulder Canyon project. Main and auxiliary control equipment, load and frequency control equipment, battery distribution switchboard, and auxiliary power control equipment for units A-6 and A-7, Boulder power plant, Boulder Canyon project, Ariz.-Calif.-Nev.
Display Title:
Boulder Canyon project. Main and auxiliary control equipment, load and frequency control equipment, battery distribution switchboard, and auxiliary power control equipment for units A-6 and A-7, Boulder power plant, Boulder Canyon project, Ariz.-Calif.-Nev.
Corporate Agency Authors:
Reclamation Bureau and Interior Department
Sort Author:
Reclamation Bureau
Date:
Nov. 23, 1937
Publish Date ISO Format:
1937-11-23T00:00:00Z
Publication Start:
19371123
Publication End:
19371123
Corporate/Agency Author:
Reclamation Bureau
Publication month:
2
Publication year:
1937
Publication place:
Denver
Printer:
Bradford-Robinson Ptg. Co.
SuDoc number:
I 27.8:756
Description:
cover title, 76. p. 21 pl. 3 tab. 4°
Notes:
(Specifications 756.) [Consists of invitation for bids, schedules, specifications, and drawings for project, proposals to be received until Dec. 21, 1937.]
Notes:
(Specifications 756.) [Consists of invitation for bids, schedules, specifications, and drawings for project, proposals to be received until Dec. 21, 1937.] † Distribution Made by Issuing Office. Paper, $3.00.
Availability:
† Distribution Made by Issuing Office. Paper, $3.00.