(Specifications 793.) [Consists of schedule, specifications, and drawings for irrigation project, proposals to be received until Aug. 5, 1938.]
Notes:
(Specifications 793.) [Consists of schedule, specifications, and drawings for irrigation project, proposals to be received until Aug. 5, 1938.] † Distribution Made by Issuing Office. Paper, $4.00.
Availability:
† Distribution Made by Issuing Office. Paper, $4.00.