Boulder Canyon project. Main and auxiliary control equipment, load and frequency control equipment, battery distribution switchboard, and auxiliary power control equipment for unit A-5. Boulder power plant, Boulder Canyon project, Ariz.-Calif.-Nev.
Publication Title:
Boulder Canyon project. Main and auxiliary control equipment, load and frequency control equipment, battery distribution switchboard, and auxiliary power control equipment for unit A-5. Boulder power plant, Boulder Canyon project, Ariz.-Calif.-Nev.
Display Title:
Boulder Canyon project. Main and auxiliary control equipment, load and frequency control equipment, battery distribution switchboard, and auxiliary power control equipment for unit A-5. Boulder power plant, Boulder Canyon project, Ariz.-Calif.-Nev.
Corporate Agency Authors:
Reclamation Bureau and Interior Department
Sort Author:
Reclamation Bureau
Date:
Oct. 8, 1940
Publish Date ISO Format:
1940-10-08T00:00:00Z
Publication Start:
19401008
Publication End:
19401008
Corporate/Agency Author:
Reclamation Bureau
Publication month:
3
Publication year:
1940
Publication place:
Denver
Printer:
Bradford-Robinson Ptg. Co.
SuDoc number:
I 27.8:936
Description:
cover title, 69, p. 21 pl. 3 tab. 4°
Notes:
(Specifications 936.) [Consists of invitation for bids, schedules, specifications, and drawings, bids will be received until Nov. 14, 1940.]
Notes:
(Specifications 936.) [Consists of invitation for bids, schedules, specifications, and drawings, bids will be received until Nov. 14, 1940.] † Distribution Made by Issuing Office. Paper, $3.00.
Availability:
† Distribution Made by Issuing Office. Paper, $3.00.