Columbia Basin project. Main and auxiliary control equipment for units L-1, L-2, and L-3, control equipment for station-service units, loadand frequency-control equipment, and heating distribution equipment, Grand Coulee power plant, Columbia Basin project, Wash.
Publication Title:
Columbia Basin project. Main and auxiliary control equipment for units L-1, L-2, and L-3, control equipment for station-service units, loadand frequency-control equipment, and heating distribution equipment, Grand Coulee power plant, Columbia Basin project, Wash.
Display Title:
Columbia Basin project. Main and auxiliary control equipment for units L-1, L-2, and L-3, control equipment for station-service units, loadand frequency-control equipment, and heating distribution equipment, Grand Coulee power plant, Columbia Basin project, Wash.
Corporate Agency Authors:
Reclamation Bureau and Interior Department
Sort Author:
Reclamation Bureau
Date:
Dec. 13, 1940
Publish Date ISO Format:
1940-12-13T00:00:00Z
Publication Start:
19401213
Publication End:
19401213
Corporate/Agency Author:
Reclamation Bureau
Publication month:
1
Publication year:
1940
Publication place:
Denver
Printer:
Eastwood Ptg. Co.
SuDoc number:
I 27.8:946
Description:
cover title, 70 p. 29 pl. 4°
Notes:
(Specifications 946.) [Consists of invitation for bids, schedules, specifications, and drawings, bids will be received until Jan. 30, 1941.]
Notes:
(Specifications 946.) [Consists of invitation for bids, schedules, specifications, and drawings, bids will be received until Jan. 30, 1941.] † Distribution Made by Issuing Office. Paper, $3.50.
Availability:
† Distribution Made by Issuing Office. Paper, $3.50.