Boulder Canyon project. Earthwork, concrete lining, and structures, wasteway no. 1, station 3+96.5 to station 176+83, Coachella Canal, station 4782+01.6, All-American Canal System, Boulder Canyon project, Ariz.-Calif.-Nev.

Tools