Central Valley project. Steel structures, 230-kv. switchyard, Shasta power plant, and 230-kv. switchyard and transformer circuits, Keswick power plant, Kennett division, Central Valley project, Calif.
Publication Title:
Central Valley project. Steel structures, 230-kv. switchyard, Shasta power plant, and 230-kv. switchyard and transformer circuits, Keswick power plant, Kennett division, Central Valley project, Calif.
Display Title:
Central Valley project. Steel structures, 230-kv. switchyard, Shasta power plant, and 230-kv. switchyard and transformer circuits, Keswick power plant, Kennett division, Central Valley project, Calif.
Corporate Agency Authors:
Reclamation Bureau
Sort Author:
Reclamation Bureau
Date:
[1946.]
Publish Date ISO Format:
1946-01-01T00:00:00Z
Publication Start:
19460101
Publication End:
19461231
Corporate/Agency Author:
Reclamation Bureau
Publication month:
13
Publication year:
1946
SuDoc number:
I 27.8:1160
Description:
[9] leaves+[2]+14 p. 16 pl. 4°
Notes:
(Specifications 1160.) [Processed. Invitation for bids, schedule, specifications, and drawings; bids will be received until Feb. 28, 1946.]
Notes:
(Specifications 1160.) [Processed. Invitation for bids, schedule, specifications, and drawings; bids will be received until Feb. 28, 1946.] † Distribution Made by Issuing Office. Paper, $1.25.
Availability:
† Distribution Made by Issuing Office. Paper, $1.25.