Missouri Basin project. 34.5-kilovolt transmission line from Pilot Butte-Thermopolis tap to Boysen Dam construction substation, 2400-volt distribution line from Boysen Dam construction substation to Boysen Government Camp and electrical distribution system for Boysen Government Camp, Boysen unit, Wyo., Missouri Basin project.
Publication Title:
Missouri Basin project. 34.5-kilovolt transmission line from Pilot Butte-Thermopolis tap to Boysen Dam construction substation, 2400-volt distribution line from Boysen Dam construction substation to Boysen Government Camp and electrical distribution system for Boysen Government Camp, Boysen unit, Wyo., Missouri Basin project.
Display Title:
Missouri Basin project. 34.5-kilovolt transmission line from Pilot Butte-Thermopolis tap to Boysen Dam construction substation, 2400-volt distribution line from Boysen Dam construction substation to Boysen Government Camp and electrical distribution system for Boysen Government Camp, Boysen unit, Wyo., Missouri Basin project.
Corporate Agency Authors:
Reclamation Bureau and Interior Department
Sort Author:
Reclamation Bureau
Date:
[1946.]
Publish Date ISO Format:
1946-01-01T00:00:00Z
Publication Start:
19460101
Publication End:
19461231
Corporate/Agency Author:
Reclamation Bureau
Publication month:
13
Publication year:
1946
SuDoc number:
I 27.8:1200
Description:
cover title, [17] leaves+ [2] +18 p. 46 pl. map. 4°
Notes:
(Specification 1200.) [Processed. Schedule, specifications, and drawings; bids will be received until Apr. 29, 1946.]
Notes:
(Specification 1200.) [Processed. Schedule, specifications, and drawings; bids will be received until Apr. 29, 1946.] † Distribution Made by Issuing Office. Paper, $1.25.
Availability:
† Distribution Made by Issuing Office. Paper, $1.25.