Colorado-Big Thompson project. Structural steel and cables for Blue River suspension bridge, Loback Ditch, Green Mountain Dam, Colorado-Big Thompson project, Colo.
Publication Title:
Colorado-Big Thompson project. Structural steel and cables for Blue River suspension bridge, Loback Ditch, Green Mountain Dam, Colorado-Big Thompson project, Colo.
Display Title:
Colorado-Big Thompson project. Structural steel and cables for Blue River suspension bridge, Loback Ditch, Green Mountain Dam, Colorado-Big Thompson project, Colo.
Corporate Agency Authors:
Reclamation Bureau and Interior Department
Sort Author:
Reclamation Bureau
Date:
[1946.]
Publish Date ISO Format:
1946-01-01T00:00:00Z
Publication Start:
19460101
Publication End:
19461231
Corporate/Agency Author:
Reclamation Bureau
Publication month:
13
Publication year:
1946
SuDoc number:
I 27.8:1479
Description:
cover title, [6] leaves+[2]+9 p. 3 pl. 4°
Notes:
(Specifications 1479.) [Processed. invitation for bids, schedule, specifications, and drawings; bids will be received until Oct. 7, 1946.]
Notes:
(Specifications 1479.) [Processed. invitation for bids, schedule, specifications, and drawings; bids will be received until Oct. 7, 1946.] † Distribution Made by Issuing Office. Paper, 50c.
Availability:
† Distribution Made by Issuing Office. Paper, 50c.