Columbia Basin project. Steed structures for 115-KV substation and 13.8-KV switchyard. Pasco pumping plant, Columbia Basin project, Wash.
Publication Title:
Columbia Basin project. Steed structures for 115-KV substation and 13.8-KV switchyard. Pasco pumping plant, Columbia Basin project, Wash.
Display Title:
Columbia Basin project. Steed structures for 115-KV substation and 13.8-KV switchyard. Pasco pumping plant, Columbia Basin project, Wash.
Corporate Agency Authors:
Reclamation Bureau and Interior Department
Sort Author:
Reclamation Bureau
Date:
[1947.]
Publish Date ISO Format:
1947-01-01T00:00:00Z
Publication Start:
19470101
Publication End:
19471231
Corporate/Agency Author:
Reclamation Bureau
Publication month:
13
Publication year:
1947
SuDoc number:
I 27.8:1849
Description:
cover title, [7] leaves+[2]+11 p. 5 pl. 4°
Notes:
(Specifications 1849.) [Processed. Invitation for bids, schedule, specifications, and drawings; bids will be received until June 20, 1947.]
Notes:
(Specifications 1849.) [Processed. Invitation for bids, schedule, specifications, and drawings; bids will be received until June 20, 1947.] † Distribution Made by Issuing Office. Paper. $1.00.
Availability:
† Distribution Made by Issuing Office. Paper. $1.00.