Davis Dam. Power transformers, oil circuit breakers, disconnecting switches, and lightning arresters for bank no. 4, Phoenix substation. Davis Dam project, Ariz.-Nev.
Publication Title:
Davis Dam. Power transformers, oil circuit breakers, disconnecting switches, and lightning arresters for bank no. 4, Phoenix substation. Davis Dam project, Ariz.-Nev.
Display Title:
Davis Dam. Power transformers, oil circuit breakers, disconnecting switches, and lightning arresters for bank no. 4, Phoenix substation. Davis Dam project, Ariz.-Nev.
Corporate Agency Authors:
Reclamation Bureau
Sort Author:
Reclamation Bureau
Date:
[1947.]
Publish Date ISO Format:
1947-01-01T00:00:00Z
Publication Start:
19470101
Publication End:
19471231
Corporate/Agency Author:
Reclamation Bureau
Publication month:
13
Publication year:
1947
SuDoc number:
I 27.8:1879
Description:
cover title, [19] leaves+[2]+17 p. 4°
Notes:
(Specifications 1879.) [Processed. Invitation for bids, schedules, and specifications; bids will be received until July 31, 1947.]
Notes:
(Specifications 1879.) [Processed. Invitation for bids, schedules, and specifications; bids will be received until July 31, 1947.] † Distribution Made by Issuing Office. Paper, $1.00.
Availability:
† Distribution Made by Issuing Office. Paper, $1.00.