Specifications 2000-2040 (with omissions). 2010. Main and station-service control equipment load and frequency control equipment station-service and unit power and control switchboards, and transformers, battery chargers, and station-service switchgear for Davis power plant, Davis Dam project, Ariz.-Nev.
Publication Title:
Main and station-service control equipment load and frequency control equipment station-service and unit power and control switchboards, and transformers, battery chargers, and station-service switchgear for Davis power plant, Davis Dam project, Ariz.-Nev.
Display Title:
Specifications 2000-2040 (with omissions). 2010. Main and station-service control equipment load and frequency control equipment station-service and unit power and control switchboards, and transformers, battery chargers, and station-service switchgear for Davis power plant, Davis Dam project, Ariz.-Nev.
Series Title:
Specifications 2000-2040 (with omissions).
Corporate Agency Authors:
Reclamation Bureau and Interior Dept.
Sort Author:
Reclamation Bureau
Date:
[1947.]
Publish Date ISO Format:
1947-01-01T00:00:00Z
Publication Start:
19470101
Publication End:
19471231
Corporate/Agency Author:
Reclamation Bureau
Publication month:
13
Publication year:
1947
SuDoc number:
I 27.8:2000, etc.
Description:
cover title, [22] leaves+[2]+92 p. 23 pl. 1 tab. 4°
Notes:
[Processed.]
Notes:
[Processed.] † Distribution Made by Issuing Office. Paper, $2.25.
Availability:
† Distribution Made by Issuing Office. Paper, $2.25.