Specifications 2031-87 (with omissions). 2051. Station-service and unit auxiliary power distribution equipment and battery-control and charging equipment for Grand Coulee power plant right powerhouse, Columbia Basin project, Wash.
Publication Title:
Station-service and unit auxiliary power distribution equipment and battery-control and charging equipment for Grand Coulee power plant right powerhouse, Columbia Basin project, Wash.
Display Title:
Specifications 2031-87 (with omissions). 2051. Station-service and unit auxiliary power distribution equipment and battery-control and charging equipment for Grand Coulee power plant right powerhouse, Columbia Basin project, Wash.
Series Title:
Specifications 2031-87 (with omissions).
Corporate Agency Authors:
Reclamation Bureau and Interior Dept.
Sort Author:
Reclamation Bureau
Date:
[1947.]
Publish Date ISO Format:
1947-01-01T00:00:00Z
Publication Start:
19470101
Publication End:
19471231
Corporate/Agency Author:
Reclamation Bureau
Publication month:
13
Publication year:
1947
SuDoc number:
I 27.8:2031,etc.
Description:
cover title, [18] leaves+ [2] +22 p. 13 pl. 4°
Notes:
[Processed.]
Notes:
[Processed.] † Distribution Made by Issuing Office. Paper, $1.75.
Availability:
† Distribution Made by Issuing Office. Paper, $1.75.