Specifications 2031-87 (with omissions). 2061. Unit control boards, main control board, and loadand frequency-control board for units R-1, R-2, and R-3 and 230-kilovolt Snohomish line, Grand Coulee right power plant. Columbia Basin project. Wash.

Tools