Specifications. 2575. Unit control boards, main control board, and loadand frequency-control equipment for units R-7, R-8, and R-9, and 230-kilovolt Spokane line no. 5 and Midway line no. 3. Grand Coulee right power plant, Columbia Basin project, Wash.
Publication Title:
Unit control boards, main control board, and loadand frequency-control equipment for units R-7, R-8, and R-9, and 230-kilovolt Spokane line no. 5 and Midway line no. 3. Grand Coulee right power plant, Columbia Basin project, Wash.
Display Title:
Specifications. 2575. Unit control boards, main control board, and loadand frequency-control equipment for units R-7, R-8, and R-9, and 230-kilovolt Spokane line no. 5 and Midway line no. 3. Grand Coulee right power plant, Columbia Basin project, Wash.
Series Title:
Specifications.
Corporate Agency Authors:
Reclamation Bureau and Interior Dept.
Sort Author:
Reclamation Bureau
Date:
[1949.]
Publish Date ISO Format:
1949-01-01T00:00:00Z
Publication Start:
19490101
Publication End:
19491231
Corporate/Agency Author:
Reclamation Bureau
Publication month:
13
Publication year:
1949
SuDoc number:
I 27.8:(nos.)
Description:
cover title, [5]+a-d leaves+[2]+22 p. 4 pl. 4°
Notes:
[Processed.]
Notes:
[Processed.] † Distribution Made by Issuing Office. Paper, 25c.
Availability:
† Distribution Made by Issuing Office. Paper, 25c.