Specifications and invitations. 3529. Power and distribution transformers and horn-cap and fuse disconnecting switches for switchyards at Upper Scooteney (PE-27A), Upper Scooteney relift (PE-27A) relift. Lower Scooteney (PE-27), Lower Saddle Gap (PE-16.4.4) and PE-17 pumping plants. Columbia Basin project. Wash.
Publication Title:
Power and distribution transformers and horn-cap and fuse disconnecting switches for switchyards at Upper Scooteney (PE-27A), Upper Scooteney relift (PE-27A) relift. Lower Scooteney (PE-27), Lower Saddle Gap (PE-16.4.4) and PE-17 pumping plants. Columbia Basin project. Wash.
Display Title:
Specifications and invitations. 3529. Power and distribution transformers and horn-cap and fuse disconnecting switches for switchyards at Upper Scooteney (PE-27A), Upper Scooteney relift (PE-27A) relift. Lower Scooteney (PE-27), Lower Saddle Gap (PE-16.4.4) and PE-17 pumping plants. Columbia Basin project. Wash.
Series Title:
Specifications and invitations.
Corporate Agency Authors:
Reclamation Bureau and Interior Dept.
Sort Author:
Reclamation Bureau
Date:
[1951.]
Publish Date ISO Format:
1951-01-01T00:00:00Z
Publication Start:
19510101
Publication End:
19511231
Corporate/Agency Author:
Reclamation Bureau
Publication month:
13
Publication year:
1951
SuDoc number:
I 27.8:(nos.)
Description:
cover title, [2]+a-1 leavcs+[2]+17 p. 5 pl. 4°
Notes:
[Processed with some printed matter to certainspecifications.]
Notes:
[Processed with some printed matter to certainspecifications.] † Distribution Made by Issuing Office. Paper, 50c.
Availability:
† Distribution Made by Issuing Office. Paper, 50c.